Mertens Primary Crushing Station

Mertens Primary Crushing Station

Read More

Petroleum Coke Load Out Facility

Petroleum Coke Load Out Facility

MARCO designed and built this Petroleum Coke Load Out Facility in Venice, IL. The plant brings in pet coke trucks and MARCO's off loading system receives the material from the trucks and transfers it to a Dual Stockpile System to ... Read More

Olivenhain Dam Project

Olivenhain Dam Project

MARCO designed and built the Material Handling System on the Olivenhain Dam Project. The system delivered 1600 Tph (590 Cu. M/ Hr) of Roller Compacted Concrete for the construction of the Dam.  The Production Plant ... Read More

Nugent Sands Largest Plant

Nugent Sands Largest Plant

MARCO designed and built Nugent Sands’ largest plant in Louisville, Kentucky.  The plant brings in sand from the Ohio River via barges and MARCO’s off loading system receives the material from the barge and transfers it to a Screening System and stockpiles ... Read More

Morton Salt Development in Ohio

Morton Salt Development in Ohio

MARCO designed, engineered and constructed a screening and stockpiling system for Morton Salt's Fairport Ohio Mine. Salt is one of the most abrasive and corrosive environments to work with. Morton Salt turned to MARCO to design, engineer and build a critical ... Read More

Saluda Dam in South Carolina

Saluda Dam in South Carolina

MARCO designed, engineered and fabricated the complete material transferring and delivery system for Barnard Construction on the Saluda Dam Project in South Carolina. The system delivers 1600 TPH (590 cu. m/ hr) of Roller Compacted Concrete for the construction of the ... Read More

Continental Cement Production Plant

Continental Cement Production Plant

MARCO completed Continental Cement Company's cement plant construction having earlier completed the design, engineering and manufacture of the systems.  The installation included: Installation of the crushing plant Screening material transfer conveyors Complete storage and material blending facility The completed project produces 1200 TPH of ... Read More

APAC Harrionsville Facility

APAC Harrionsville Facility

MARCO designed, engineered and constructed a complete aggregate processing plant for APAC at their Harrisonville plant. The system MARCO supplied included: Primary impact station with a Universal MaxCap 150 ton Surge Hopper which allows for truck load out Pioneer 8x20 triple deck screen plant Kodiak ... Read More