Morton Salt Development in Ohio

MARCO designed, engineered and constructed a screening and stockpiling system for Morton Salt’s Fairport Ohio Mine.

Salt is one of the most abrasive and corrosive environments to work with. Morton Salt turned to MARCO to design, engineer and build a critical component of their new plant in record breaking time.  Morton Salt had an installation time requirement that mandated the facility not be shut down for more than two weeks!

MARCO took the challenge and hit the ground running.  MARCO succeeded both structurally and in the time frame!

Note: All structures are coated with state-of-the-art ceramic paint which required special equipment and handling to properly apply.   This coating capability is now a current capacity for MARCO clients!