Petroleum Coke Load Out Facility

MARCO designed and built this Petroleum Coke Load Out Facility in Venice, IL. The plant brings in pet coke trucks and MARCO’s off loading system receives the material from the trucks and transfers it to a Dual Stockpile System to store the material for re-sale.

The system is designed to unload trucks and stockpile at a rate of 1,000 TPH.  The surge tunnels are equipped with vibratory feeders and conveyors capable of 1,500 TPH flow rate.  Each and/or both of the Surge Tunnel Conveyors feed a 54″ belt width Telescoping Barge Load Conveyor loading at a rate of 2,000 TPH.

 

 

54" Telescoping Barge Loading Conveyor During Installation.

54″ Telescoping Barge Loading Conveyor During Installation.

48" Belt Width Conveyors From Surge Tunnels Feeding Barge Load Conveyor.

48″ Belt Width Conveyors From Surge Tunnels Feeding Barge Load Conveyor.