Olivenhain Dam Project

MARCO designed and built the Material Handling System on the Olivenhain Dam Project.

The system delivered 1600 Tph (590 Cu. M/ Hr) of Roller Compacted Concrete for the construction of the Dam.  The Production Plant included Steep Transfer Conveyors and a Swivel Truck Feeding System with Hydraulic Lifting Capability.

MARCO also designed and built all structural supports and required chute work to complete the project.

By successful completion of the project over 1700 feet of MARCO Tubular Truss was in productive use!